River Terrace Playground

Project Overview

Replacement of the Poured-in-Place (PIP) surface at ECE and 5-12 playgrounds due to the presence of lead above the EPA limit.

Location

405 Anacostia Ave NE, Washington, DC 20019

Client

DC DGS

General Contractor

WKM Solutions