Luke C. Moore HS

Project Overview

The restoration team executed the careful removal of lead based paint to ensure the well-being of occupants and visitors. The project involved thorough assessments to identify areas affected by lead based paint, followed by the implementation of appropriate techniques to safely strip and dispose of hazardous material. Specialized equipment and containment measures were employed to minimize the spread of dust and contaminants during the removal process. The restoration efforts prioritized the preservation of architectural features, ensuring that the historical integrity of the building surfaces and elements were retained throughout the restoration process.

Location

1001 Monroe St NE, Washington, DC 20017

Client

DC DGS

General Contractor

WKM Solutions