Roosevelt Pool

Project Overview Design and construction of a new ADA accessible exterior entrance at Roosevelt High School swimming pool for public access outside school hours. Location 4301 13th St NW, Washington, DC 20011 Client DGS & DCPS General Contractor WKM Solutions

LeDroit Park

Project Overview Provide all design, preconstruction, cost estimating, bidding and construction services. Obtain all permits and approvals necessary to complete project. Provide and install splash pads including hookup to the city sanitary system and new water service and meter. Splash pads are a stand-alone recirculated system with water treatment technology providing 100% filtration and disinfection […]

Dunbar High School

Project Overview As part of the renovation project, a demolition and disposal process were executed to remove a total area of 2,500.00 square feet. Following the removal, a meticulous replacement of the subfloor was undertaken, ensuring a sturdy and reliable foundation for the upcoming improvements. In the gymnasium, a sanding and sealing procedure was performed, […]

Fox Chapel ES

Project Overview The interior renovation of the main entry lobby, an adjacent classroom space, a portion of the circulation corridor and the administrative suite to provide a new secure vestibule and entry access sequence. The renovations include additions and alterations to the mechanical, electrical power, electrical lighting, plumbing, life-safety, low-voltage, security, and fire alarm systems. […]

River Terrace Playground

Project Overview Replacement of the Poured-in-Place (PIP) surface at ECE and 5-12 playgrounds due to the presence of lead above the EPA limit. Location 405 Anacostia Ave NE, Washington, DC 20019 Client DC DGS General Contractor WKM Solutions

Howard University Plaza Tower

Project Overview Paint and Patch 2 coats of paint for the entire hallway walls including door, door trims from P level to 10th floor. Shampoo and remove stain from carpet tile on all corridors from 1st to 10th floor. Color to match existing. Locksmith Furnish and install material necessary to repair any door in need […]

Luke C. Moore HS

Project Overview The restoration team executed the careful removal of lead based paint to ensure the well-being of occupants and visitors. The project involved thorough assessments to identify areas affected by lead based paint, followed by the implementation of appropriate techniques to safely strip and dispose of hazardous material. Specialized equipment and containment measures were […]

Fredrick Courthouse Bathroom

Project Overview The project entails the renovation of a total of 12 restrooms (6 for men and 6 for women) at the Frederick County Courthouse to comply with ADA (Americans with Disabilities Act) Standards. The renovation work includes modifications and upgrades to the existing restrooms, such as the installation of grab bars, accessible sinks, toilets, […]

DCPS Warehouse

Project Overview The warehouse interior renovation project aimed to transform an existing warehouse facility into a more functional, efficient, and visually appealing space. The scope included upgrades and improvements to the layout, systems, safety measures, aesthetics, and sustainability considerations. The renovated warehouse provides an enhanced working environment. The project also included installation of a networkable […]