Banneker Swing Space

Project Overview The Project goal is to create sufficiently appropriate space for an interim swing space solution for School Without Walls at Francis Stevens (“SWWFS”), a District of Columbia Public School (“DCPS”) that serves students in grades Pre-K3 through 8th grade. b) Verify the school’s existing conditions and design for the renovation of selective areas […]
St. Elizabeth Hospital Flooring

Project Overview Remove existing wood flooring materials and install new wood luxury vinyl flooring materials in a total of eleven (11) patient residential pods of the hospital, as shown on the attached drawings. Repair and skim the damaged floor base. Provide and install new 9-inch x 59.72-inch high performance UV-Cured Polyurethane Wood flooring materials with […]
Whittier ES Elevator Installation

Project Overview WKM designed and constructed new elevator systems and ramps, ensuring ADA compliance and improved accessibility within the existing buildings. The project entailed meticulous engineering and architectural considerations to seamlessly integrate these accessibility features while respecting the architectural integrity of the structures. Working diligently during non-school hours, the construction teams meticulously executed the installation […]
Centralized Access Control

Project Overview Upgrade and centralize access control (ACS) and intrusion detection (IDS) systems at various schools. b) The scope of this project is to replace and/or install electronic access control systems and intrusion detection systems across all schools in order to consolidate under one platform for each system. c) For the ACS, the requirement is […]
Oyster Adams Playground and Field Replacement

Project Overview First, the design of two playgrounds, one for 5-12 age group and the other for ECE students, along with site, landscaping, and drainage improvements. The design complied with the standards set forth by DGS/DCPS, and was vetted and approved by these entities prior to implementation. Second, the installation of two new playgrounds with […]
MacArthur High School 1st Phase Renovation

Project Overview Phase 1 of the renovation project at MacArthur High School involves upgrading the cafeteria and kitchen areas. The scope of work includes conducting a detailed assessment and designing a comprehensive plan, obtaining necessary approvals, and making infrastructure upgrades such as electrical, plumbing, and ventilation systems. New kitchen equipment will be procured and installed, […]
Wheatley Education Campus Playgound

Project Overview The project includes collaborating with a qualified playground designer to create a modern and engaging design that aligns with safety regulations and community preferences. After securing the necessary permits, the existing playground will be safely demolished, and construction will commence on the new, thoughtfully designed playground. Throughout the process, strict adherence to quality […]
Capital Hill Montessori @ Logan

Project Overview WKM was tasked with demolishing existing structures and executing the installation of a new playground and roof upgrades. The project encompasses meticulous planning, design, and construction efforts to meet client objectives, while complying with safety regulations and standards. Key objectives include safe demolition, modern playground creation, roof enhancement for functionality and energy efficiency, […]
Public Service Commision

Project Overview The renovation of a Public Service Commission office building aimed to improve the conference room, waiting area, and office spaces. Objectives include enhancing functionality, aesthetics, and efficiency across these areas. The renovation involves installing state-of-the-art audiovisual equipment, optimizing layouts, upgrading furniture, and improving lighting and ambiance. Throughout the project, meticulous planning, and quality […]
Howard University Drew and Cook Hall

Project Overview Our team is performed touch ups and thoroughly cleaning at Drew and Cook Hall to prepare for the Fall 2023 semester. Drew Hall, an all-male freshman residence housing 330 new students, is receiving enhancements to create a supportive and inspiring environment for the young scholars. Meanwhile, at Cook Hall, our focus is on […]
Johns Hopkins Club House

Project Overview Indoors, all lights were relamped, light switches made fully functional, and fan coolers were maintained to run at full capacity. We soft-cleaned all carpets, made the bathrooms fully functional by deep cleaning and replacing all toilets, replaced broken window glass, removed large kitchen appliances, and thoroughly cleaned the kitchen. Exhaust fans were removed […]
Bunker Hill Elementary School

Project Overview Design and construction of a three-stop ADA-compliant elevator, seamlessly integrated with the existing structure to support movement of students, staff, and medical equipment. Replacement of the building’s water heater system. Installation of an underground stormwater management system to improve drainage and protect the site from flooding. Full integration of MEP (Mechanical, Electrical, Plumbing), […]