LeDroit Park

Project Overview

Provide all design, preconstruction, cost estimating, bidding and construction services. Obtain all permits and approvals necessary to complete project. Provide and install splash pads including hookup to the city sanitary system and new water service and meter. Splash pads are a stand-alone recirculated system with water treatment technology providing 100% filtration and disinfection to meet DOH requirements. System includes easy to understand operation timed scenarios and controls, themed for sight, hearing and touch. System allows 10%-20% additional paved areas to capture overspray and a perimeter slot drain to contain all treated water within the system. System includes water activators and ground lighting features with consideration of power consumption and environmental factors, and monitoring of water quality. Provide Standard Splash Pad Water Play Rules Signs for Parks. Provide and install enhanced shade structures and elements with minimum shade of 1,000 SF. All new landscaping includes a 2yr warranty and maintenance. Protect existing hardscape, landscape and walkways.

Location

286 V St NW, Washington, DC 20001

Client

DGS & DPR

General Contractor

WKM Solutions