Whittier ES Elevator Installation

Project Overview

WKM designed and constructed new elevator systems and ramps, ensuring ADA compliance and improved accessibility within the existing buildings. The project entailed meticulous engineering and architectural considerations to seamlessly integrate these accessibility features while respecting the architectural integrity of the structures. Working diligently during non-school hours, the construction teams meticulously executed the installation of the new elevator systems, strategically placing them to provide smooth vertical transportation for individuals with mobility challenges. Additionally, carefully designed ramps were built at strategic locations, providing accessible pathways throughout the buildings.

Location

6201 5th St NW, Washington, DC 20011

Client

DC DGS

General Contractor

WKM Solutions