MANHATTAN BEACH CLUB HOUSE, SEVERN, MD
February 25, 2018

Project Details

Description

the installation of terrazzo and ceramic tiles throughout the entire 100,000 square feet school. This extensive project includes tasks such as site preparation, demolition of existing flooring if necessary, surface leveling, installation of terrazzo and ceramic tiles, grouting, polishing, and final cleaning. The project will adhere to industry standards and best practices, ensuring precise placement, alignment, and meticulous attention to detail. The goal is to create a visually stunning, durable, and low-maintenance flooring system that enhances the aesthetics, functionality, and longevity of the school, providing a conducive and inspiring environment for students, teachers, and staff.