Project Details

Description

Cut and dispose 1" off the existing playground rubber surface- 2 sides only 33LF and 2LF
Cut and dispose 2ft of asphalt- Same sides where the rubber is being demo, just to extend the opening to 3ft total
Power wash surround the playground
Demo and dispose (2) red benches from the playground area. Patch the floor as needed.
Furnish and install (2) new 6 Ft benches- 4 weeks lead time Pour 3-4"new asphalt on excavated areas
Work to be done over the weekend and finish by Monday 10/14/2019