Project Details
Services: Construction, Commercial Development
Location: 6201 5th St NW, Washington, DC 20011
Project Status: Completed
Client: DC DGS
General Contractor: WKM Solutions LLC
Subcontractor: Collins Elevator Service Inc., Procraft Construction, Precision Ironworks, LLC.,
Contract Value: $1,608,081.18
Scope of Work
WKM designed and constructed new elevator systems and ramps, ensuring ADA compliance and improved accessibility within the existing buildings. The project entailed meticulous engineering and architectural considerations to seamlessly integrate these accessibility features while respecting the architectural integrity of the structures. Working diligently during non-school hours, the construction teams meticulously executed the installation of the new elevator systems, strategically placing them to provide smooth vertical transportation for individuals with mobility challenges. Additionally, carefully designed ramps were built at strategic locations, providing accessible pathways throughout the buildings.